Originally posted by thatsmrmastercraft
View Post
Announcement
Collapse
No announcement yet.
What Work did you do on your Mastercraft Today?
Collapse
X
-
Originally posted by epnault View PostWhen it comes to trailer wiring always make sure you have a great ground. That is usually the culprit.Kevin
Comment
-
-
*6-7 hours of polishing out rub marks and a few scuffs and waxing/polishing
*Sanded down teak and threw some linseed/spirits on it.
*repainted platform brackets
*cleaned interior
*Got nautic logic 100% done
*changed out winch handle
* went to the lake. Took a few surf sets to test out the new ballast and took 1 wakeboard set which ended with a binding coming dislodged and a twisted ankle. YAY for that one!
Kids were stoked to be back on the water even if they couldn't get in.
Comment
-
-
Shower install
Might seem a little redneck but installed a home made shower in the X2 last week. Hot and cold 1/4 ball valves tied with a T to the pump and an extended sink sprayer for the shower head. Pump has pressure switch which gives an auto shut off when releasing handle. Still tied to a master switch for power.Our 2014 X2 is Sold.
Comment
-
Comment